The UCB Campus Windlesham, designed by the internationally renowned architectural practice Thomas Heatherwick, features the refurbishment of an existing campus in Surrey and the construction of a new three-story timber building at its core. 


HESS TIMBER was entrusted with the design, manufacture, delivery, and installation of the timber structure. This innovative structure features curved, straight, and rounded glulam timber, along with 1,500 m³ of cross-laminated timber (CLT), 30% of which was in curved formations, defining the building's distinctive shape. The curvature of the CLT components was achieved through precision CNC machining. 


The project greatly benefited from a collaborative approach among all stakeholders, facilitating meticulous program scheduling to optimize delivery timelines and maintain uninterrupted progress on-site. The overall program included 18 months of design work, 6 months of manufacturing, and 6 months of on-site installation. 


Due to the complexity of the project and the various products used (CLT + glulam) the timber components were manufactured across different production facilities of the HASSLACHER group. This fully utilised the capabilities and capacities of the mass timber manufacturing facilities.


High levels of prefabrication, including the preassembly of steel components at the HASSLACHER groups factories, streamlined on-site operations, ensuring swift and efficient assembly. As a result, the project achieved reduced on-site construction time, fully capitalizing on the advantages offered by off-site timber construction methods.  

Location

Windlesham, Surrey, Great Britain

Client

UCB UK

General contractor

ISG Construction Limited

Architect

Heatherwick Studio + Veretec UK

Construction period

2023 - 2024

Status

Completed

Project category

Glued laminated timber, Cross laminated timber, Multistorey

Details

  • Wood species: European spruce
  • Volume: ca. 1,500 m³ of  cross laminated timber and 100 m³ of glued laminated timber
  • 1292 individual timber components

UCB Campus Windlesham 1/4

© HESS TIMBER | born2design

UCB Campus Windlesham 2/4

© HESS TIMBER | born2design

UCB Campus Windlesham 3/4

© HESS TIMBER | born2design

UCB Campus Windlesham 4/4

© HESS TIMBER | born2design