Waste-to-energy plant in Leeds with living wall, glulam arch and glazed office block under a cloudy sky

Leeds waste incineration plant

Leeds I Great Britain

With a height of 42 meters, the Recycling and Energy Recovery Facility in Leeds is one of the largest timber construction projects in the UK. The assembly of the glulam construction was divided into a total of eight construction phases and lasted from April 2014 to May 2015. The main building of the 3 buildings in the complex is 42 meters high, 123 meters long and 35 meters wide. The partially block-glued glulam beams have a cross-section of 400 x 760 mm.

Watch video

Such plants are usually built far away from cities. But not in this case. With this design, the internationally renowned French architect Jean Robert Mazaud demonstrated how wood as a building material acts as an ideal intermediary in the context of sustainable resource management.

Leeds Recycling and Energy Recovery Facility under construction: tall glulam arches with a crawler crane beside the plant

“The project marks a milestone in the history of HESS TIMBER, because in addition to the impressive project size of 2,600 m³ of glulam, it is also the first complete design & build project and thus marks the successful entry into a new market segment.”

Rensteph Thompson Dipl.-Ing. Rensteph Thompson Managing Director HESS TIMBER

View through the curved glulam arch frames and bolted purlins high above the plant machinery, with Leeds in the distance
The facility at sunset, partly clad in translucent panels, with exposed glulam arches and cranes on site
Interior of a hall with a dense glulam truss frame for walls and roof beneath translucent cladding
Completed waste-to-energy plant in Leeds under a stormy sky, its arched glulam frame lit behind a translucent facade
Contact us